Superpod® – Innovative Australian integrated steel passive house system
Australian Energy Rating for first house – 8.7 stars
Supporters of Superpod® Passive House Design and Construct
Build time from slab to lock up building envelope – 3-4 weeks

Professional Consultants who have given generously of their time

Architectural – Michael McCabe Architects, especially Michael McCabe, Nick Webb and Glen Blamey
Engineering – Pat Baygar and Associates, especially Shan Lau
Steel fabrication – Structural Challenge, especially Maria Mavrikos and Christopher Chua

Other Consultants

Passive House Consultant – Mosart trading as Passive House Academy, especially Tomas O’Leary and Bob Ryan

Sponsors of product

Sealing products – Hanno Werk
Air ventilation unit – Brink Climate Systems
Stainless steel benches – Stoddart
Window consultation and door hardware – , Kommerling, Fenestration Solutions Australia and Roto Frank
Steel – Surdex, Australian Tube Mills
Finishing oil for concrete and hoop pine ply – Livos

Installers and local building team who have given generously of their time

Concrete/Landscaping – Brian Peacock
Steel fabrication and erection – Structural Challenge
Electrical and builder – John Oldham, Gavin Phillips
Plumber – Brendan Goodman – TruBlue Plumbing
Panel installer – Andy Coleman – Arctic Constructions

With deepest thanks to those who have given generously over many months, and to those who jumped through hoops at the end!